A free construction punch list template for a real walk.

A construction punch list and closeout checklist covering every trade, from framing to final cleaning. Print the PDF for the walk, fill in the Excel spreadsheet (it opens in Google Sheets too), or use PunchLog to capture each item on your phone instead.

Want the list on your phone, with photos and no re-typing? PunchLog is free while in beta, on iPhone today. Download for iPhone or register your company.

Not sure what goes in each column? Read what to include in a punch list.

The short answer

What is a construction punch list?

A construction punch list is a written list of the small items left to fix at the end of a job: a scratched door, a missing cover plate, a paint touch-up, a drawer that rubs. Each line says where the problem is, what is wrong, and which trade has to fix it. The walk usually happens near substantial completion, and the job is not closed out until every item is corrected and someone has checked it. This page gives you the working pieces: a printable PDF for the walk, a spreadsheet you can fill in on a laptop, and a checklist for every trade from framing to final cleaning. Use them as they are, or adapt them to your contract. For who owes what, how a punch list ties to substantial completion, and how to get one closed out, read the full punch list guide.

Running the walk

How do you run a punch list walk? Five steps, every time.

  1. 01

    Walk the space in one consistent order

    Room by room, floor by floor, the same path every time. A punch list built from memory misses whatever was behind you.

  2. 02

    Photograph every defect where it sits

    One photo per item, marked up on the spot. A description written later is a description written wrong.

  3. 03

    Assign each item to the trade that owns it

    One item, one trade. A list split across three people's memory is a list nobody closes.

  4. 04

    Set a due date and track it to closed

    Open, in progress, ready for review, closed. Nothing sits in an inbox waiting to be remembered.

  5. 05

    Share a signed report when the trade finishes

    A sheet the sub can sign on the spot beats a verbal "looks good" that nobody wrote down.

Example

What does one filled-in line look like?

Example of one filled-in punch list line
LocationTradeDescriptionPhotoDue dateStatusSign-off
Unit 204, kitchenDrywallSeam showing above range hood, needs another coat and sandPhoto of the seamOct 21ClosedJ. Alvarez, Oct 22

Closeout checklist

What should a closeout checklist cover, trade by trade?

The same checklist the PDF and the spreadsheet use, in the columns shown above. Not exhaustive for every job, but a solid start for a typical closeout walk.

Framing

  • Walls plumb and level
  • Headers sized to the opening
  • Blocking in place at fixture locations
  • No split or cracked studs
  • Subfloor secured, no squeaks

Drywall

  • Seams taped and finished smooth
  • No visible screws or fastener pops
  • Corners square and crack-free
  • Texture matches the surrounding wall
  • No soft spots or dents before paint

Paint

  • Even coverage, no roller marks or holidays
  • Trim lines crisp against adjoining surfaces
  • No drips, runs, or brush marks
  • Color and sheen match the spec
  • Touch-ups blended in, not spot-visible

Flooring

  • No gaps at transitions or thresholds
  • Level, with no lippage between pieces
  • Grout or seam lines consistent
  • No scratches, chips, or stains
  • Baseboards sealed to the floor

Electrical

  • Outlets and switches level and secure
  • Cover plates installed, none cracked
  • GFCI protection where required
  • Fixtures wired, mounted, and working
  • Panel labeled and breakers identified

Plumbing

  • No leaks at fixtures or supply lines
  • Proper drainage, no standing water
  • Fixtures level and caulked
  • Shutoffs accessible and labeled
  • Water pressure normal at every fixture

HVAC

  • Registers installed and balanced
  • Thermostat programmed and functioning
  • No visible duct leaks or gaps
  • Filters in place and clean
  • Unit runs without unusual noise or vibration

Doors and hardware

  • Doors swing freely, no binding
  • Hardware installed and operating
  • Weatherstripping intact on exterior doors
  • Thresholds level and secure
  • Locks and latches engage properly

Exterior

  • Siding and trim sealed at joints
  • Grading slopes away from the foundation
  • Gutters secured, clear, and draining
  • Exterior paint or finish complete
  • Walkways and steps safe and level

Final cleaning

  • Surfaces wiped down, no construction dust
  • Floors swept, vacuumed, and mopped
  • Windows and mirrors cleaned
  • Debris and packaging removed from site
  • Fixtures free of stickers and protective film

New to punch lists? Read the punch list guide for who owes what and how to close one out.

A printed sheet works for one walk. For a job with more than a handful of items, PunchLog photographs each defect, pins it on the floor plan, and sends it to the trade that owns it, all without a signal.